Engineering & compliance

Built to the standard that governs it — line by line.

Nothing here is experimental. The village is a conventional CSA A277 modular deployment on a serviced municipal lot, held to the Manitoba Building Code and the relevant CSA installation codes.

Sub-arctic winterization profile

CSA A277

Factory-certified shells

Bulk-ordered manufactured shells from Ontario, capped at $20,000 CAD base price, certified to CSA A277 before they leave the plant so the RM of Rosser inspects site work only, not structure.

MBC 9.25 · CAN/ULC-S705.2

Closed-cell spray foam envelope

Three inches of closed-cell polyurethane applied to the interior of every shell, delivering a continuous airtight air and vapour barrier in a single pass — no poly, no seams to fail at -40 °C.

MBC 9.12 · 9.16

Insulated frost-wall skirting

Each unit sits on pressure-treated timber skids over gravel, wrapped with a 2" XPS insulated skirt anchored to the perimeter to stop sub-floor wind wash and frost heave.

MBC 9.32 · CSA F326

Mandatory heat recovery ventilation

A mini HRV in every single unit. In an envelope this airtight, ventilation is not optional — it is the mould and indoor-air-quality control strategy.

Manitoba Plumbing Code · MH standards

8-foot utility trenching

Water, wastewater, and Manitoba Hydro conduits are buried 8 feet deep beneath the gravel perimeter road — below the regional frost line — eliminating heat-trace dependency and winter service failures.

CSA B214

Central hydronic distribution

Hot water generated in the Hub utility room is pumped through pre-insulated mains under the gravel paths into subfloor PEX in each home. One serviceable plant instead of fifty failure points.

Code compliance matrix

The review package the RM of Rosser and MMF technical staff receive, in summary form.

SystemStandardRequirementDesign approach
Factory-built shellsCSA A277Plant certification of modular building assembliesShells certified in-plant before shipment; site inspection covers siting and services only.
Structure & foundationMBC Part 9.12 / 9.16Support, frost protection, and skid-mounted foundationsPressure-treated timber skids on engineered gravel pad with continuous 2" XPS frost skirt.
Air & vapour barrierMBC 9.25 · CAN/ULC-S705.2Continuous air barrier and vapour control in Zone 7A3" closed-cell polyurethane spray foam serving as insulation, air barrier, and vapour retarder.
Energy efficiencyMBC 9.36Prescriptive/trade-off effective thermal resistance for housingEffective assembly values verified by trade-off path; HRV credit applied.
VentilationMBC 9.32 · CSA F326Mechanical ventilation with heat recovery in tight envelopesMini HRV mandatory in every unit, balanced and commissioned at occupancy.
Life safetyMBC 9.10.19Interconnected smoke alarms and CO alarmsHard-wired smoke + CO alarms per unit; Hub functions as a 72-hour warming centre.
Hydronic heatingCSA B214Installation code for hydronic heating systemsCentral boiler, pre-insulated buried mains, subfloor PEX, pressure-tested per loop.
Fuel-fired boilerCSA B149.1Natural gas and propane installation codeBoiler room ventilation, clearances, and shutoffs per B149.1; biomass option per CSA B366.
Plumbing & servicesManitoba Plumbing CodePotable water protection and burial depth below frost8-ft burial, master meter and backflow prevention at the gate, sewer drop at the front node.
Electrical & solarCSA C22.1 Section 64Renewable energy systems and grid interconnectionCommercial array with rapid shutdown, labelled disconnects, and a Manitoba Hydro interconnection agreement.
Fire accessMBC 3.2.5Unobstructed firefighting access route20-ft gravel perimeter loop, plow-maintained year round, within reach of every unit entry.
AccessibilityMBC 3.8Barrier-free path of travel to assembly occupancyAccessible stalls, firm-surface path from parking to Hub, barrier-free Hub washrooms.
PlayspaceCSA Z614Children's playspaces and equipmentCompliant fall zones and engineered wood fibre surfacing.

Final stamped drawings to be issued by the project's Manitoba-licensed engineer of record.

Energy & mechanical rationale